Richmond Hill · Study requirementswritten

Hydrogeological Study Requirements

Published by City of Richmond Hill under Site Alteration Permits

Alias
Hydrogeological Report
Applies to
designer

The expanded path of the City of Richmond Hill's hydrogeological study requirements, applied where a development sits within the Richmond Hill Urban Master Environmental Servicing Plan study area or carries larger groundwater implications. It adds ecologically significant recharge areas, a pre- and post-development water balance under source water protection planning, and contaminant migration assessment to the minor path's borehole and monitoring-well investigation, and closes with a notes section on how a revised proposal is reflected in an updated report.

What it covers

  • Investigation/Evaluation
  • Impact and Potential Short/Long Term Impact Assessment
  • Mitigation Measures and Monitoring Plan
  • Drawings and Supporting Information
  • Additional Resources
  • Notes
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Richmond Hill
Category
Study requirements · site alteration
Published under
Site Alteration Permits — the municipality's own heading
Agencies
Ministry of the Environment, Conservation and Parks
Signatories
professional geoscientist · exempted engineer
Required for
Groundwater taking or contamination assessment for development within the Urban MESP study area or with larger-scale groundwater implications
Tags
terms-of-referencehydrogeological-studymajor-pathgroundwaterumesp
Hydrogeological Study RequirementsOpen at richmondhill.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.