Richmond Hill · Study requirementswritten

Municipal Street Lighting Design Requirements

Published by City of Richmond Hill under Site Alteration Permits

Agencies
Alectra Utilities
Applies to
designer

The City of Richmond Hill's coordination requirements for relocating an existing municipal street light — whether on its own standard or mounted to an Alectra hydro pole — to make room for a new driveway or roadway entrance in a site alteration proposal. It sets clearances (a 1.2 m clear zone from the curb, a 0.6 m setback from sidewalks, 6.0 m from street trees), assigns relocation costs to the applicant, and calls for a photometric analysis only when the proposed shift from the light's current position is significant.

What it covers

  • Existing Municipal Street Light Standards
  • Existing Municipal Street Lights Mounted to Hydro Poles
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Richmond Hill
Category
Study requirements · site alteration
Published under
Site Alteration Permits — the municipality's own heading
Alias
Municipal Street Lighting Design Photometric Analysis
Required for
Relocation of an existing municipal street light for a site alteration proposal
Tags
site-lightingstreet-light-relocationsite-alterationutility-coordination
Municipal Street Lighting Design RequirementsOpen at richmondhill.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.