Richmond Hill · Study requirementswritten
Published by City of Richmond Hill under Site Alteration Permits
The City of Richmond Hill's coordination requirements for relocating an existing municipal street light — whether on its own standard or mounted to an Alectra hydro pole — to make room for a new driveway or roadway entrance in a site alteration proposal. It sets clearances (a 1.2 m clear zone from the curb, a 0.6 m setback from sidewalks, 6.0 m from street trees), assigns relocation costs to the applicant, and calls for a photometric analysis only when the proposed shift from the light's current position is significant.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.