Richmond Hill · Checklistswritten

Mechanical Unit Data Sheet

Published by City of Richmond Hill under Building Permits

Applies to
designer
Work types
mechanical rooftop installation
Signatories
structural engineer
Building types
non-residential

Richmond Hill's Form T5, completed by the structural engineer assessing the impact of a new or relocated mechanical unit on an existing roof structure, referenced from the tenant permit checklist when rooftop equipment changes are proposed. It records the building's design snow load values under Division B, Article 4.1.6.2 of the Ontario Building Code, then per-unit dimensions, height above roof, added snow load, snow-piling length and weight for up to four units, followed by the engineering firm's reinforcement conclusion.

What it covers

  • Application Information
  • Design Criteria
  • Mechanical Unit Data
  • Consultant Data
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Richmond Hill
Category
Checklists
Published under
Building Permits — the municipality's own heading
Required for
New or relocated rooftop mechanical units assessed against the existing roof structure
Tags
checklistmechanicalstructuralrooftop-equipment
Mechanical Unit Data SheetOpen at richmondhill.ca