Markham · Inspectionswritten

Framing Inspections

Published by City of Markham under Building Permit Process

Alias
Framing Inspection Checklist
Applies to
any
Building types
residential

The City of Markham's information sheet on the framing inspection, conducted once plumbing, heating and electrical work are roughed in and before insulation goes in, with the heating and plumbing rough-in inspections carried out at the same visit. It explains that structural members are inspected to confirm the building's structural loads transfer to the foundation. A provincially qualified building inspector reviews columns and beams, floor joists, wall studs, windows, roof spaces and trusses, masonry, and fire separation, matched by a reverse-side deficiency checklist.

What it covers

  • Columns
  • Support of Walls
  • Anchorage of Building Frames
  • Floor Joists
  • Wall Studs
  • Windows
  • Roof Spaces-Ventilation and Trusses
  • Above-Grade Masonry
  • Fire Separation, Collapse and Reduction
  • Stairs
  • Ceramic Tile Reinforcement
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Markham
Category
Inspections
Published under
Building Permit Process — the municipality's own heading
Tags
inspection-checklistresidentialframingstructural
Framing InspectionsOpen at markham.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.