Markham · Certificateswritten
Published by City of Markham under Building Permit Process
The City of Markham's certificate testing an installed fire pump system before the Building Standards Department's witness test. Its checklist covers the pump's capacity to run at full load for two hours or thirty minutes depending on the building's scope under Section 3.2.6 of the Ontario Building Code, suction and discharge gauge installation, dedicated transfer switches, feeder fire-resistance rating, conductor sizing at 125 percent of full load, and fire alarm annunciation of the pump. The installer and building owner or representative sign, certifying testing to the CSA and/or ULC listing and NFPA 20 where applicable.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.