This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The rough-in inspection for the heating system, distinct from Markham's heating final information sheet for the same trade at completion: it is often conducted to coincide with the framing and plumbing rough-in inspections, before insulation goes in. It confirms the system is sized and installed to meet heating and ventilation needs for a healthy living environment. A provincially qualified building inspector reviews the supply air system, return air system, exhaust systems and mechanical ventilation, matched by a reverse-side deficiency checklist.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.