MarkhamBuilding InspectionsInspections

Plumbing System Sewer Inspections For Infill Housing

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Map
Published by
City of Markham
Date
January 1, 2025
Also called
Plumbing System Sewer Inspection for Infill Housing
For
builder
Building types
All building types
Pages
5

Overview

Markham's Builder Tip No. 103, dated January 1, 2025, on the sewer piping inspection for infill homes, filed with the City's housing tips under the 2024 Ontario Building Code; the City's New Home Report refers to it for sewer connections. It quotes the roles of chief building officials and builders, Sentence 7.3.6.1.(5) on ball tests and Article 7.4.10.8. on hydraulic loads. Its objective lists the six items a plan and cross-section show, from invert elevations to slope, and three sample sheets carry a Sanitary Sewer Plan and Sanitary Sewer Cross-Section.

What it covers

  • Ontario Building Code Act
  • Role of Chief building officials
  • Role of builders
  • Ontario Building Code
  • 7.3.6.1. Tests and Inspection of Drainage or Venting Systems
  • 7.4.10.8. Hydraulic Loads on Sanitary Building Drains or Sewers
  • Objective
  • Sanitary Sewer Plan
  • Sanitary Sewer Cross-Section
  • Summary
  • Notes
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Plumbing System Sewer Inspections For Infill Housing

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.