MarkhamBuilding InspectionsInspections

Permitted Openings In Wall Fire Separations

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
Also called
Permitted Openings in Wall Fire Separation
For
builder
Building types
All building types
Pages
4
Instruments
CAN/ULC-S115, Standard Method of Fire Tests of Firestop Systems · MMAH Supplementary Standard SB-3, Fire and Sound Resistance Tables · MMAH Supplementary Standard SB-2, Fire Performance Ratings

Overview

Markham's four-page Builder Tip No. 81, dated January 1, 2025 and updated to the 2024 OBC, one of the City's housing tips under the 2024 Ontario Building Code and a longer companion to its tip on openings in wall and ceiling assemblies. It quotes Article 9.10.5.1. and Subsection 9.10.9. on continuous barriers and penetrations sealed by firestops tested to CAN/ULC-S115, then lists the exceptions for combustible wiring, 4-gang outlet boxes and 30 mm water pipes. Its objective describes putty pads between outlet boxes and their acoustic rating.

What it covers

  • 9.10.5.1. Permitted Openings in Wall Membranes
  • 9.10.9. Fire Separations and Smoke-tight Barriers between Rooms and Spaces Within Buildings
  • 9.10.9.1. Application
  • 9.10.9.2. Continuous Barrier
  • 9.10.9.6. General Requirements for Penetrations of Fire Separations
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Permitted Openings In Wall Fire Separations

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.