MarkhamBuilding InspectionsInspections

Supply and Return Air Ducts in Exterior Walls

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
For
builder
Building types
All building types
Pages
3

Overview

Markham's three-page Builder Tip Issue No. 19, dated January 1, 2025 and updated to the 2024 Ontario Building Code, on heating ducts and return-air chases built into exterior walls or walls next to an attached garage; one of the City's housing tips. It quotes Articles 9.25.2.1., 9.25.2.3., 9.25.3.1., 9.25.3.3. and 9.25.4.1. on insulation, its protection, air barriers and vapour barriers. The Objective cites the 22 °C indoor temperature and illustrates two ways to keep the wall insulated: a 2x6 stud cavity, or 2x4 studs with exterior rigid insulation.

What it covers

  • 9.25.2.1. Required Insulation
  • 9.25.2.3. Installation of Thermal Insulation
  • 9.25.3.1. Required Barrier to Air Leakage
  • 9.25.3.3. Continuity of the Air Barrier System
  • 9.25.4.1. Required Barrier to Vapour Diffusion
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Supply and Return Air Ducts in Exterior Walls

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.