MarkhamBuilding InspectionsInspections

Building Drain Cleanout

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
For
builder
Building types
All building types
Pages
3
Instruments
ASTM F626 · CSA-B181.1 · CSA-B181.2 · CSA-B182.1 · CSA-B182.2

Overview

Builder Tip Issue No. 29 from the City of Markham Building Standards Department, a three-page tip dated January 1, 2025 and updated to the 2024 Ontario Building Code, one of the City's housing tips. It quotes Article 7.4.7.1. on cleanouts over running traps and an NPS 4 cleanout where the building drain leaves the building, Article 7.4.7.4. on 45° bends, and Article 7.2.5.11. listing the ABS, PVC and CPVC pipe standards. The Objective explains the sewer gas risk of a poorly installed cleanout and illustrates a screw-cover arrangement.

What it covers

  • 7.4.7.1. Cleanouts for Drainage Systems
  • 7.4.7.4. Location of Cleanouts
  • 7.2.5.11. Plastic Pipe, Fittings and Solvent Cement Used in Buildings
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Building Drain Cleanout

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.