MarkhamBuilding InspectionsInspections
Published by City of Markham
This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
Markham's Builder Tip No. 70, dated January 1, 2025 and updated to the 2024 OBC, linked on the City's Builder Tips page as permitted openings in wall assemblies and filed with the housing tips under the 2024 Ontario Building Code. It quotes Article 9.10.5.1., Permitted Openings in Wall Membranes, on electrical outlet boxes in fire-rated wall and ceiling membranes, offset boxes on both sides of a wall, and duct openings in ceilings rated under SB-3 and SB-2. Its objective describes gypsum board between outlet boxes in one stud space.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.