MarkhamBuilding InspectionsInspections

Winter Construction (Protection From Freezing)

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
Also called
Winter Construction (Protection from Freezing)
For
builder
Building types
All building types
Pages
3

Overview

Builder Tip No. 47 from the City of Markham's Building Standards Department, dated January 1, 2025 and updated to the 2024 OBC, listed on the City's Builder Tips page among the tips for housing projects permitted under the 2024 Ontario Building Code. It quotes Article 9.12.1.3., Protection from Freezing, for the bottom of excavations, and its objective explains frost heave, how cold weather is defined, why footings on frozen soil settle unevenly, insulated blankets, a geotechnical engineer's Frost Protection Plan, and site visits by the Special Investigation Unit.

What it covers

  • 9.12.1.3. Protection from Freezing
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Winter Construction (Protection From Freezing)

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.