MarkhamBuilding InspectionsInspections

Shoring Requirements For Housing Foundation Walls

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
Also called
Shoring Requirements for Housing Foundation Walls
For
builder
Building types
All building types
Pages
4
Instruments
Occupational Health and Safety Act · O. Reg. 213/91

Overview

The City of Markham's four-page Builder Tip No. 98, dated January 1, 2025, on supporting excavations for house foundations next to property lines, one of the City's housing tips under the 2024 Ontario Building Code. It quotes Article 9.12.1.4., Precautions During Excavation, and section 234 of the Occupational Health and Safety Act regulation O. Reg. 213/91 on support systems and soil types. Its objective describes the City's two shoring conditions, excavation within 1200 mm of a property line or Diagram 1 distances, and 600 mm of undisturbed soil.

What it covers

  • 9.12.1.4. Precautions During Excavation
  • Occupational Health and Safety Act (OHSA) 234.
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Shoring Requirements For Housing Foundation Walls

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.