This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Markham's information sheet on the plumbing rough-in inspection, distinct from its plumbing final sheet for the same trade at completion and from its plumbing drains and sewers sheet. It notes that this inspection is conducted with the framing inspection, and explains that drainage, waste, venting and water distribution systems are inspected to confirm they operate properly. A provincially qualified building inspector reviews materials and equipment, testing, piping, traps, cleanouts, slope and length of drainage pipe, stack vents and vent pipes, matched by a reverse-side deficiency checklist.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.