MarkhamBuilding InspectionsInspections

Heating Final Inspections

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Markham
Also called
Heating Final Inspection Checklist
For
any
Building types
All building types
Pages
2

Overview

The completion inspection for the heating system, distinct from Markham's heating rough-in information sheet for the same trade at an earlier construction stage: it is normally conducted as part of the occupancy inspection and usually coincides with the plumbing final inspection. It confirms the supply and return air systems, mechanical ventilation system and furnace are complete and operational. A provincially qualified building inspector reviews general items, supply and return air systems, mechanical ventilation and heat recovery ventilators, matched by a reverse-side deficiency checklist.

What it covers

  • General
  • Supply and Return Air Systems
  • Mechanical Ventilation
  • Heat Recovery Ventilators
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Heating Final Inspections

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.