MarkhamBuilding InspectionsInspections

Stud Wall Reinforcement For Future Grab Bars In Dwelling Units (Housing)

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
Also called
Stud Wall Reinforcement for Future Grab Bars in Dwelling Units
For
builder
Building types
All building types
Pages
3

Overview

Builder Tip No. 82 of the City of Markham Building Standards Department, dated January 1, 2025 and updated to the 2024 OBC, on blocking in main bathroom walls of new homes, listed with the City's housing tips under the 2024 Ontario Building Code. It quotes Article 9.5.2.4., Stud Wall Reinforcement, naming the grab bars at a water closet, shower and bathtub it refers to, and its objective adds the 1.3 kN load from Sentence 9.31.2.3.(1), the case of no side wall beside the toilet, and an illustrated layout.

What it covers

  • 9.5.2.4. Stud Wall Reinforcement
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Stud Wall Reinforcement For Future Grab Bars In Dwelling Units (Housing)

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.