MarkhamBuilding InspectionsInspections

Plumbing Final Inspections

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Markham
Also called
Plumbing Final Inspection Checklist
For
any
Building types
All building types
Pages
2

Overview

The completion inspection for the plumbing trade, distinct from Markham's plumbing rough-in information sheet for the same trade at an earlier stage and from its separate plumbing drains-and-sewers sheet: it is requested once fixtures and appliances are installed and is often combined with the occupancy and heating final inspections. It confirms the drainage, venting, water distribution, fixtures and appliances operate properly and supply safe drinking water. A provincially qualified building inspector reviews materials, piping and valves, traps, cleanouts, vent pipes, fixtures and appliances, and basement rough-in plumbing.

What it covers

  • Materials and Equipment
  • Traps
  • Cleanouts
  • Slope and Length of Drainage Pipe
  • Vent Pipes
  • Piping and Valves
  • Fixtures and Appliances
  • Basement Rough-In Plumbing
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Plumbing Final Inspections

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.