MarkhamBuilding InspectionsInspections
Published by City of Markham
This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
Markham's Builder Tip Issue No. 8, dated January 1, 2025 and updated to the 2024 Ontario Building Code, on the waterproof finish around showers and bathtubs, one of the City's housing tips. It quotes Subsection 9.29.2., with its heights (1.8 m in shower stalls, 1.2 m above tubs with showers, 400 mm above tubs without) and the listed tile, vinyl, hardboard and laminate materials, and Article 9.29.10.4. on moisture-resistant backing. The Objective and an illustration show tile over water-resistant gypsum board around a tub without a shower.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.