MarkhamBuilding InspectionsInspections

Windows Over Stairs, Ramps & Landings

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
For
builder
Building types
All building types
Pages
2
Instruments
Supplementary Standard SB-7

Overview

The City of Markham Building Standards Department's Builder Tip No. 53, dated January 1, 2025 and updated to the 2024 OBC, on glazing over stairs in dwelling units, filed with the City's housing tips under the 2024 Ontario Building Code. It quotes Sentence 9.8.8.1.(7) on glazing less than 900 mm above treads, ramps or landings, and its objective describes guards at low stairwell windows, a picket guard's height, spacing and climb-resistance, guards drawn in Supplementary Standard SB-7, safety glass guards, and non-openable windows built to guard loads.

What it covers

  • 9.8.8.1. Required Guards
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Windows Over Stairs, Ramps & Landings

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.