MarkhamBuilding InspectionsInspections

Header Wrap Air Barrier

Published by City of Markham

This is the City of Markham’s document, as published on its website on 18 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Markham
Date
January 1, 2025
Also called
“Header-Wrap” Air Barrier
For
builder
Building types
All building types
Pages
3

Overview

Markham's Builder Tip Issue No. 21, linked as the “Header-Wrap” Air Barrier tip among the City's housing tips under the 2024 Ontario Building Code and dated January 1, 2025. It quotes Articles 9.25.3.1. to 9.25.3.3. on the air barrier system, its properties and continuity, including Sentence (5.1) on sealing or lapping a header wrap to the wall air barrier above and below. The Objective identifies the foundation-to-floor-header junction as a major leakage point under stack effect and covers sealing seams and corners with acoustical sealant or sheathing tape.

What it covers

  • 9.25.3.1. Required Barrier to Air Leakage
  • 9.25.3.2. Air Barrier System Properties
  • 9.25.3.3. Continuity of the Air Barrier System
  • Objective
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Header Wrap Air Barrier

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.