Brampton · Applicationswritten
Published by City of Brampton under Homeowners
The City of Brampton Building Division's boiler replacement package from the city's homeowners permit page. Its requirements sheet lists a plumbing schematic showing the proposed boiler's location and its connection to the municipal water service with the location and type of backflow preventer, pointing to a sample drawing, and two copies of the manufacturer's specifications for the boiler, alongside the fee for the city's standard ten day application service. Schedule 1 and the applicable law checklist follow.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.