Published by City of Brampton under Permit Expiry And Extensions
A sample of the mandatory inspections card the City of Brampton's Building Division issues with a permit, marked SAMPLE ONLY and posted with its inspection pages. Check marks pick out the prescribed inspections for a project across three columns — building, from start of construction and footings through fire separations to occupancy and final; plumbing, from water service and underground plumbing to fixtures; and HVAC, from insulation and rough-in to substantial completion. A second list names the general review reports, from soils bearing capacity to integrated systems testing.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.