The City of Brampton Planning, Building, & Growth Management Department's manual for subdivision construction. It sets out what pre-construction site meeting minutes record, then the major construction items — erosion and sediment control, bedding material testing, compaction plots, mandrel and television inspection of storm sewers, proof rolling, concrete and asphalt mixes, noise walls and street lighting — followed by preliminary acceptance, daily construction checks, and underground and aboveground guidelines. The balance is standard letters, certificates, subdivision and assumption checklists, and the as-constructed drawing and CAD compliance requirements.
What it covers
- Pre-construction site meeting minutes requirements
- Pre-construction data required
- Major construction items
- Preliminary acceptances
- Daily construction checks
- Inspections - consultant's advice
- Underground guidelines
- Aboveground guidelines
- Standard letters
- Trench backfill / road subgrade proof roll certificate
- Street lighting certification letter
- Street sign inspection request
- Storm water management facility certificate
- Lot grading certification procedure
- Noise attenuation works certification
- Berm elevation certification
- Subdivision checklists
- Site alteration permit requirements for subdivisions and site plans
- Preliminary acceptance checklist
- End of maintenance checklist
- Subdivision traffic signing assumption checklist
- Checklist to open arterial / collector road
- Subdivision assumption check list
- Miscellaneous items
- Civil consultant certificate of clearance
- Landscape architect certificate of clearance
- Certification of fence locations
- Driveway paving waiver
- Requirements for as-constructed drawings
- CAD compliance certification letter
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
- Publisher
- City of Brampton Planning, Building, & Growth Management Department
- Category
- Study requirements
- Published under
- Guidelines Manuals — the municipality's own heading
- Work types
- subdivision development · road construction · storm sewer · street lighting
- Instruments
- City of Brampton Standard Specifications and Drawings · BSS 1150 (Brampton Standard Specifications – Hot Mix Asphalt)
- Signatories
- consulting engineer · soils consultant engineer · landscape architect
- Tags
manualsubdivisionconstruction-inspectionassumption