Brampton · Study requirementswritten
Published by City of Brampton under Development Application Guidelines
Brampton's terms of reference for an erosion and sediment control plan (ESC plan) — drawings and supporting documentation showing that placing fill, removing topsoil or altering grade does not harm the receiving storm drainage and natural heritage systems. Its content list covers final elevations and drainage, a description of the fill and its source locations with soil tests, retaining wall design, the property's legal description, designation and zoning, owner, agent, engineer and contractor contacts, fees and securities under the site alteration by-law, haul routes, and dust and mud control.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.