Mandatory Inspections for Garden Suites

Published by City of Brampton under Welcome

Alias
Garden Suites
Applies to
homeowner

The mandatory inspection sequence for a garden suite, one of six City of Brampton sheets reproducing what is printed on the back of a permit card, and the detached counterpart to the two and three unit dwelling sheets for additional residential units. Five steps run from start of construction and footings through water service, outside sewers, perimeter insulation, backfill and weeping tile connection, drain waste and vents, inside drains, HVAC rough-in, exterior insulation, structural framing, fire separation, insulation and air barrier, exposed floor insulation, to occupancy and final inspection.

What it covers

  • Start of Construction
  • Footings
  • Water Service
  • Outside Sewers
  • Perimeter Insulation
  • Backfill
  • Weeping Tile Connection
  • Drain Waste and Vents
  • Inside Drains
  • HVAC Rough-In
  • Exterior Insulation
  • Structural Framing
  • Fire Separation
  • Insulation, Vapour Barrier & Air Barrier
  • Exposed Floor Insulation
  • Occupancy Inspection
  • Final Inspection
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Inspections
Published under
Welcome — the municipality's own heading
Tags
checklistresidentialinspectionsadditional-residential-unitspermits
Mandatory Inspections for Garden SuitesOpen at brampton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.