- Window
- standard 10 day permit application service
- Applies to
- homeowner
- Work types
- alteration/repair
- Signatories
- designer · applicant
The City of Brampton Building Division's homeowner package for a permit to install new plumbing fixtures or finish roughed-in plumbing, bundling the requirements sheet with Schedule 1: Designer Information and the applicable law checklist. The sheet asks for a plan view of the existing floor area with each proposed fixture located and labelled — new sink, new laundry tub, new shower — against a sample drawing, and names the $326.21 fee for the standard 10 day permit application service and the condominium common element notice.
What it covers
- Permit Application Requirements – New Plumbing Fixtures
- Required Documents & Plans
- Plan Drawings
- Building Permit Issuance
- Schedule 1: Designer Information
- A. Project Information
- B. Individual who reviews and takes responsibility for design activities
- C. Design Activities Undertaken by Individual Identified in Section B.
- D. Declaration of Designer
- Section GI. Documents Establishing Compliance with Applicable Law (OBC Div. A - 1.4.1.3.)
- Applicable Laws
- Applicant's Declaration
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
- Publisher
- City of Brampton Building Division
- Category
- Applications · plumbing
- Published under
- Homeowners — the municipality's own heading
- Alias
- Plumbing Fixtures/Finishing Roughed-in Plumbing
- Instruments
- Building Code Act, S.O. 1992, c.23 · City of Brampton By-law 387-2006 · Ontario Building Code
- Required for
- A building permit for new plumbing fixtures or finishing roughed-in plumbing
- Document date
- Revised Feb 2026
- Building types
- residential
- Document date display
- February 2026
- Tags
applicationplumbingresidentialapplicable-law