- Alias
- Pre-Occupancy Requirements
- Submit to
- the building inspector
- Applies to
- contractor
- Work types
- new construction
The City of Brampton Building Division's pre-occupancy sheet for new industrial, commercial and institutional buildings, the companion to its start of construction sheet. It names the life safety testing witnessed at occupancy — standpipe and hose, fire pump, sprinklers, fire alarm, elevator recall, backup generator, smoke control fans and duct detectors — then itemises the documentation: architect, structural, mechanical, electrical and civil certifications of completion under OBC Division C Article 1.3.3.1, monthly field reviews, soils, rebar, concrete, masonry, compaction, structural steel, building envelope and roofing reports, and integrated testing reports.
What it covers
- General requirements
- Building inspections
- Plumbing inspections
- HVAC inspections
- Partial occupancy
- Required documentation
- General reviews and field observations reviews
- Independent inspection / reviews to be included in submission for occupancy
- Fire alarm system
- Sprinkler, standpipe and hose systems
- Integrated testing of life safety systems
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
- Publisher
- City of Brampton
- Category
- Checklists
- Published under
- A Zindex — the municipality's own heading
- Instruments
- OBC Division C Article 1.3.3.1 · CAN/ULC S1001 · CAN/ULC S537-04 · CAN/ULC S524-01 · CAN/ULC S561-01 · NFPA-13 · NFPA-14 · CAN/CSA-S16 · CSA A660 · CSA W-47
- Signatories
- architect · structural engineer · mechanical engineer · electrical engineer · civil engineer
- Required for
- Occupancy of new ICI buildings
- Building types
- non-residential
- Tags
checklistoccupancyinspection-checklistnon-residential