Brampton · Checklistswritten

Start of Construction for ICI Projects — New Buildings

Published by City of Brampton under A Zindex

Alias
Start of Construction Requirements
Applies to
contractor
Work types
new construction
Instruments
NFPA 96 · CAN/ULC

The City of Brampton Building Division's start of construction sheet for new industrial, commercial and institutional buildings, the front half of a pair completed by its pre-occupancy sheet. It names listings and details gathered before inspection — firestopping at electrical conduits, pipes and fire separation edges, shaft wall assemblies with a note that BMEC ruling 890-01-118 has been revoked for horizontal shaft wall ceilings, fire separations and firewalls — then plumbing pressure testing and backflow preventers, HVAC fire damper cut sheets and the smoke test for NFPA 96 grease ducts.

What it covers

  • General requirements
  • Building inspections
  • Plumbing inspections
  • HVAC inspections
  • Helpful links and contacts
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Checklists
Published under
A Zindex — the municipality's own heading
Building types
non-residential
Tags
checklistinspection-checklistnew-constructionnon-residential
Start of Construction for ICI Projects — New BuildingsOpen at brampton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.