Brampton · Study requirementswritten

Stormwater Management Report Terms of Reference

Published by City of Brampton under Development Application Guidelines

Alias
Stormwater Management Report
Applies to
designer
Document date
March 2019

The City of Brampton's single-page terms of reference for a stormwater management report, issued by Engineering & Development Services. It names the two drainage plans the report carries — pre-development contours, runoff coefficients, external contributing areas, flood plain limits and existing outlets, then post-development areas, sewer system, proposed measures and overland flow route — and the calculations that follow: the allowable release rate, storage volume calculated against volume provided, sizing of the controls, and quality measures including OGS units and infiltration facilities.

What it covers

  • 1. Introduction
  • 2. Stormwater Drainage
  • 2.1 Pre-development storm drainage
  • 2.2 Post-development storm drainage
  • 3. Stormwater Management
  • 3.1 Stormwater quantity controls
  • 3.2 Stormwater quality controls
  • 4. Erosion and sediment controls
  • 5. Conclusion and recommendations
  • Tables
  • Figures
  • Appendix
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Study requirements
Published under
Development Application Guidelines — the municipality's own heading
Publisher note
Issued by Engineering & Development Services / Development Approvals.
Tags
terms-of-referencestormwaterdrainageengineering
Stormwater Management Report Terms of ReferenceOpen at brampton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.