Brampton · Study requirementswritten
Published by City of Brampton under Development Application Guidelines
The City of Brampton's single-page terms of reference for a stormwater management report, issued by Engineering & Development Services. It names the two drainage plans the report carries — pre-development contours, runoff coefficients, external contributing areas, flood plain limits and existing outlets, then post-development areas, sewer system, proposed measures and overland flow route — and the calculations that follow: the allowable release rate, storage volume calculated against volume provided, sizing of the controls, and quality measures including OGS units and infiltration facilities.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.