Brampton · Inspectionswritten

Mandatory Inspections for Three Unit Dwelling

Published by City of Brampton under Welcome

Alias
Three-Unit Dwellings
Applies to
homeowner

The mandatory inspection sequence for a three unit dwelling, one of six City of Brampton sheets reproducing what is printed on the back of a permit card, and the counterpart to the two unit dwelling and garden suite sheets for other additional residential units. Five steps run from start of construction and footings through water service and backfill, underground plumbing, drain waste and vents, water distribution and HVAC rough-in, structural framing, fire separation and building envelope, to plumbing fixtures, HVAC completion, interior finishes, occupancy and final inspection.

What it covers

  • Start of Construction
  • Footings
  • Water Service
  • Backfill
  • Underground Plumbing
  • Drain Waste and Vents
  • Water Distribution System
  • HVAC Rough-In
  • Structural Framing
  • Fire Separation
  • Building Envelope
  • Plumbing Fixtures and Appliances
  • Completion of HVAC System
  • Interior Finishes
  • Occupancy Inspection
  • Final Inspection
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Brampton
Category
Inspections · new house
Published under
Welcome — the municipality's own heading
Tags
checklistresidentialinspectionsadditional-residential-unitspermits
Mandatory Inspections for Three Unit DwellingOpen at brampton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.