Brampton · Inspectionswritten
Published by City of Brampton under Welcome
The mandatory inspection sequence for a two unit dwelling, one of six City of Brampton sheets reproducing what is printed on the back of a permit card, and the counterpart to the three unit dwelling and garden suite sheets for other additional residential units. Five steps run from start of construction and footings through water service, underground plumbing, drain waste and vents, water distribution and HVAC rough-in, structural framing, backfill and building envelope, to plumbing fixtures, HVAC completion, interior finishes, fire separation, occupancy and final inspection.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.