1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerPlanning ApplicationsSite Plan

Attachment #3 Stormwater Management Facility (SWMF)

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Document
Published by
City of Kitchener
Also called
Attachment3 stormwater swmf
For
designer
Building types
All building types
Pages
1
Agencies
City of Kitchener

Overview

A one-page Kitchener form, Attachment #3 to the Municipal Stormwater Management System Post-Construction Verification Checklist, for recording one stormwater management facility. It carries fields for the SWMF identifier, SWMF type and location by road or intersection, then inspection items on design conformity, permanent pool level, control and drain valves, visual and olfactory observations, sediment, erosion, inlet, outlet and headwall condition and obstructions, each with an Included column. The City links it from its sanitary and stormwater alterations page.

What it covers

  • Attachment #3
  • Stormwater Management Facility (SWMF)
  • Instruction
  • Item
  • Included
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Attachment #3 Stormwater Management Facility (SWMF)

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.