1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerPlanning ApplicationsSite Plan

CLI ECA Alteration Submission Checklist

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

2 editionsChoose one to open it.

Open at source

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Overview

The City of Kitchener's seven-page CLI ECA Alteration Submission Checklist from the Sanitary and Stormwater Utilities Division. It explains the two types of alteration, sanitary collection and stormwater management, then sets out five parts with yes, no or N/A boxes: general information, cover letter, the MECP forms A1, SS1, SS2, SW1, SW2 and SW3, a project report or design brief, and supporting documents. It is used with the City's CLI-ECA process diagram and the Ministry's design criteria.

What it covers

  • Types of Alterations
  • Submission Requirements for All Application Types
  • Part One: General Information
  • Part Two: Cover Letter
  • Part Three: Complete MECP Forms
  • Sewage Collection System Alterations
  • Stormwater Management System Alterations
  • Part Four: Project Report/Design Brief
  • Part Five: Supporting Documents
  • CLI ECA Alteration Submission Checklist
  • Part Six: Applicant Acknowledgement and Authorization
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

No document open

Choose an edition beside to open it here.