1. 1Pick a permit guide
  2. 2Read the municipality’s steps

Also from BlinKode: CodeEase →

KitchenerPlanning ApplicationsSite Plan

CLI-ECA for a Municipal Stormwater Management System Post Construction Verification Checklist

Published by City of Kitchener

The municipality lists what to submit. CodeEase shows what the building code asks of it. See CodeEase →

This is the City of Kitchener’s document, as published on its website on 23 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Checklist
Published by
City of Kitchener
Date
Rev. 0 - January 29, 2026
Also called
Municipal Stormwater Management System Post-Construction Verification Checklist (fillable PDF)
For
designer
Building types
All building types
Pages
5
Agencies
City of Kitchener · Region of Waterloo
Instruments
CLI-ECA 019-S701 · OPSS MUNI-100 · Construction Act, Form 9

Overview

The City of Kitchener's five-page post construction verification checklist for alterations to a municipal stormwater management system under its Consolidated Linear Infrastructure environmental compliance approval. After project background, construction phases and project scope, it lists inspection and testing records for storm sewers, low impact development, oil and grit separators and stormwater management facilities, then an applicant acknowledgement. Its three attachments are separate Kitchener forms for each LID, OGS and SWMF installation.

What it covers

  • A. Project Background Information
  • B. Construction Phase Information
  • C. Project Scope
  • D. Inspection and Testing Records
  • 1. Storm Sewers
  • 2. Low Impact Development (LID)
  • 3. Oil and Grit Separator (OGS)
  • 4. Stormwater Management Facility (SWMF)
  • E. Applicant Acknowledgement
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

CLI-ECA for a Municipal Stormwater Management System Post Construction Verification Checklist

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.