BramptonPlanning ApplicationsPlanning guidelines

Drawing Standards

Published by City of Brampton

This is the City of Brampton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Guide
Published by
City of Brampton
Date
May 10, 2022
Form reference
Section 51 (17) of the Planning Act, R.S.O., 1990
For
designer
Building types
All building types
Pages
3

Overview

The City of Brampton's drawing standards for planning application submissions, issued by Planning, Building & Growth Management. It opens with the twelve items the Planning Act names for a draft plan of subdivision, then gives twenty-one items for a conceptual site development plan at 1:200 — site statistics, setbacks, parking layout, easements, service lines, contours — followed by elevations and roof plans, floor plans, the property survey, the surveyor's certificate for subdivision and condominium, and a georeferenced DGN or DWG file in UTM zone 17, NAD83.

What it covers

  • Draft Plan
  • Information to be shown on the Draft Plan under Section 51 (17) of the Planning Act, R.S.O., 1990
  • Site Plan (Conceptual Site Development Plan)
  • Elevations
  • Floor Plans
  • Property Survey:
  • Surveyor's Certificate:
  • GIS Requirement
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Drawing Standards

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.