TorontoPlanning ApplicationsEvery planning application
Published by City of Toronto
This is the City of Toronto’s document, as published on its website on 20 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The Environment and Energy Division's voluntary performance standards for backup power in Toronto's multi-unit residential buildings, existing and new, drawn from a study with the Hidi Group. It separates emergency power for life safety from backup power for occupant well-being, then sets performance standards for essential loads beyond life safety — additional elevators, domestic water booster and sump pumps, hot water boilers and pumps, common areas — 72 hours of supply, natural gas generators and load management, with a One Bloor case study and a MURB archetypes appendix.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.