TorontoPlanning ApplicationsEvery planning application
Published by City of Toronto
This is the City of Toronto’s document, as published on its website on 20 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
A four-page visual checklist from the City of Toronto for preparing a site plan drawing, laid out as an annotated sample ground-floor plan with 29 numbered call-outs and a legend. A checklist reference guide on the following pages groups the items under drawing setup, site and property, circulation and access, dimensions and labeling, and utilities and infrastructure. The City links it among application support material for site plan applications, next to the Terms of Reference for the supporting studies and plans.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.