Certified Utility Plan - Terms of Reference

Published by City of Mississauga

This is the City of Mississauga’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Study
Published by
City of Mississauga
Date
October 2025
Also called
Certified Utility Plan Terms of Reference
For
designer
Building types
All building types
Pages
2
Valid for
9 months from the date of certification

Overview

Mississauga's terms of reference for a certified utility plan, an October 2025 guide from the Planning & Building Department's Development Engineering & Construction section. It defines the plan as a drawing of every existing and proposed utility on a site and the adjacent road right-of-way, certified by an Ontario professional engineer from physical locates by test pits or geophysics. It lists the utilities covered, the 1:200 plan and 1:50 cross-section contents, the engineer's certification wording, the link to a PUCC submission, and the plan's nine-month validity.

What it covers

  • What is it?
  • Who prepares it?
  • When is it required?
  • How to prepare it?
  • (i) Plans
  • (ii) Cross-Sections
  • Additional Resources
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Certified Utility Plan - Terms of Reference

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.