MississaugaPlanning ApplicationsPlanning guidelines

Final Grading Plan Terms of Reference

Published by City of Mississauga

This is the City of Mississauga’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice

Type
Study
Published by
City of Mississauga
Date
October 2025
Also called
Grading Plan - Terms of Reference
For
designer
Building types
All building types
Pages
4

Overview

The City of Mississauga's terms of reference for a grading plan, from the Building Division and Development Engineering & Construction, dated October 2025. It explains what a grading plan is, who prepares it (a Professional Engineer or Ontario Land Surveyor), and the applications it supports, from rezoning and site plan control to building permits. Numbered lists set out the general and detailed grading information to show, including swales, retaining walls, sump pump discharge and the City benchmark, followed by the standard notes printed on every Mississauga grading plan.

What it covers

  • What is it?
  • Who prepares it?
  • When is it required?
  • How to prepare it?
  • General Information
  • Detailed Grading Information
  • Grading Plan Standard Notes
  • Additional Resources
Check this against the municipality before you rely on it.

DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.

Final Grading Plan Terms of Reference

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.