Toronto · Study requirementswritten

Design Criteria for Sewers and Watermains, Second Edition — Chapter 6 Updated Sep 2022

Published by City of Toronto Engineering & Construction Services under Application Support Material Terms Of Reference

Alias
Design Criteria for Sewers and Watermains
Applies to
designer
Work types
municipal servicing · site servicing
Document date
January 2021

The second edition of the City of Toronto's design criteria manual for sewers and watermains, reissued with its material specifications chapter updated in September 2022 — the cover states chapter 6 updated Sep 2022, and the contact is a different Engineering & Construction Services engineer than on the January 2021 issue. The manual runs from engineering submissions, drawing requirements, geotechnical investigation, piling and shoring, Ministry of the Environment, Conservation and Parks approval, the transfer of review program and easements, through sanitary sewers, storm sewers, watermains, lot grading and materials.

What it covers

  • Introduction
  • What This Manual Contains
  • Chapter 1 – Engineering Submissions
  • Development Engineering Applications
  • Engineering Drawing Requirements
  • Geotechnical Investigation and Soils Report
  • Piling and Shoring
  • Expanded Transfer of Review Program
  • Easement Requirements
  • Chapter 2 – Sanitary Sewers
  • Chapter 3 – Storm Sewers
  • Chapter 4 – Watermains
  • Chapter 5 – Lot Grading
  • Chapter 6 – Material Specifications
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Toronto Engineering & Construction Services
Category
Study requirements
Published under
Application Support Material Terms Of Reference — the municipality's own heading
Agencies
City of Toronto Engineering & Construction Services · Ministry of the Environment, Conservation and Parks
Tags
design-criteriasewerswatermainsmunicipal-servicingmaterial-specifications
Design Criteria for Sewers and Watermains, Second Edition — Chapter 6 Updated Sep 2022Open at toronto.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.