Toronto · Applicationswritten
Published by City of Toronto under Non Utility Cut Permit Application
Appendix B to the City of Toronto's Municipal Consent Requirements, carried on the City's non-utility cut permit application path. Two pages tabulate the utilities a drawing set circulates to — Toronto Hydro-Electric System, Enbridge Gas Distribution, Bell Canada, Rogers, Beanfield, Enwave, Hydro One, the TTC, Zayo, Telus, Teraspan, Videotron and others — each with an escalation contact, a circulation e-mail and the accepted submission type. A second table lists non-TPUCC members Metrolinx and the University of Toronto with the zones their circulation covers.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.