Toronto · Applicationswritten

Appendix B – Utility Circulations Contacts

Published by City of Toronto under Non Utility Cut Permit Application

Alias
TPUCC Contact Information
Applies to
contractor
Instruments
Municipal Consent Requirements
Document date
July 14, 2026

Appendix B to the City of Toronto's Municipal Consent Requirements, carried on the City's non-utility cut permit application path. Two pages tabulate the utilities a drawing set circulates to — Toronto Hydro-Electric System, Enbridge Gas Distribution, Bell Canada, Rogers, Beanfield, Enwave, Hydro One, the TTC, Zayo, Telus, Teraspan, Videotron and others — each with an escalation contact, a circulation e-mail and the accepted submission type. A second table lists non-TPUCC members Metrolinx and the University of Toronto with the zones their circulation covers.

What it covers

  • Appendix B – Utility Circulations Contacts
  • Non-TPUCC Members
  • Notes
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Toronto
Category
Applications
Published under
Non Utility Cut Permit Application — the municipality's own heading
Agencies
City of Toronto Transportation Services · Metrolinx · University of Toronto
Work types
utility cut · non-utility cut · installation of services
Tags
contactsutility-cutmunicipal-consentright-of-waytpucc
Appendix B – Utility Circulations ContactsOpen at toronto.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.