Toronto · Study requirementswritten
Published by City of Toronto under Pre Application Consultation
Appendix O to the City of Toronto municipal consent requirements, revised 29/10/2021: a three-page table of preferred vertical and horizontal clearances, in millimetres, between plant in the road allowance. Rows run through electricity for Hydro One Networks and Toronto Hydro conduits, chambers, poles and vaults, traffic signal duct and controller boxes, Enbridge gas mains and regulator stations, Enwave steam and chilled water, telecommunications for Bell Canada, Rogers, Telus and others, TTC streetcar track allowance, water and hydrants, and storm and sanitary sewers by pipe diameter.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.