Toronto · Study requirementswritten
Published by City of Toronto Environment and Energy Division under Application Support Material Terms Of Reference
The Environment and Energy Division's voluntary performance standards for backup power in Toronto's multi-unit residential buildings, existing and new, drawn from a study with the Hidi Group. It separates emergency power for life safety from backup power for occupant well-being, then sets performance standards for essential loads beyond life safety — additional elevators, domestic water booster and sump pumps, hot water boilers and pumps, common areas — 72 hours of supply, natural gas generators and load management, with a One Bloor case study and a MURB archetypes appendix.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.