Mississauga · Study requirementswritten

Development Requirements Manual — Appendices

Published by City of Mississauga Transportation & Works Department under Shoring Requirements Checklist

Alias
City's terms of reference
Submit to
Transportation and Works Department
Applies to
designer
Document date
January 2019

The appendices to the City of Mississauga Transportation & Works Department development requirements manual, effective January 2019, linked from the city's shoring requirements checklist page as its terms of reference. Appendix A carries the Schedule G securities format with summary and detailed cost estimate examples; Appendix B four sample engineering letters, from consultant and geotechnical letters of retention to the pre-servicing indemnification letter and the Ontario Land Surveyors certification on the final M-plan; Appendix C the utility plan terms of reference; and Appendices D and E the title block and comment response matrix templates.

What it covers

  • Appendix A: Schedule “G” Format
  • Summary of Cost Estimate (Example)
  • Detailed Cost Estimate (Example)
  • Appendix B: Engineering Submission Letter Templates
  • Consultant Letter of Retention (Sample Letter)
  • Geotechnical Engineers' Letter of Retention (Sample Letter)
  • Indemnification Letter (for Pre Servicing Subdivisions) (Sample Letter)
  • Ontario Land Surveyors Certification re: Final M-Plan (Sample Letter)
  • Appendix C: Terms of Reference
  • Utility Plan (Terms of Reference)
  • Appendix D: Title Block Template
  • Title Block (Template)
  • Appendix E: Comment Response Matrix
  • Comment Response Matrix (Template)
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Mississauga Transportation & Works Department
Category
Study requirements
Published under
Shoring Requirements Checklist — the municipality's own heading
Agencies
City of Mississauga Transportation and Works Department · Region of Peel
Work types
subdivision · site plan · excavation and shoring
Signatories
professional engineer · Ontario Land Surveyor
Tags
terms-of-referencedevelopment-requirementsutility-plantemplatesengineering-submission
Development Requirements Manual — AppendicesOpen at www7.mississauga.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.