- Alias
- City's terms of reference
- Submit to
- Transportation and Works Department
- Applies to
- designer
- Document date
- January 2019
The appendices to the City of Mississauga Transportation & Works Department development requirements manual, effective January 2019, linked from the city's shoring requirements checklist page as its terms of reference. Appendix A carries the Schedule G securities format with summary and detailed cost estimate examples; Appendix B four sample engineering letters, from consultant and geotechnical letters of retention to the pre-servicing indemnification letter and the Ontario Land Surveyors certification on the final M-plan; Appendix C the utility plan terms of reference; and Appendices D and E the title block and comment response matrix templates.
What it covers
- Appendix A: Schedule “G” Format
- Summary of Cost Estimate (Example)
- Detailed Cost Estimate (Example)
- Appendix B: Engineering Submission Letter Templates
- Consultant Letter of Retention (Sample Letter)
- Geotechnical Engineers' Letter of Retention (Sample Letter)
- Indemnification Letter (for Pre Servicing Subdivisions) (Sample Letter)
- Ontario Land Surveyors Certification re: Final M-Plan (Sample Letter)
- Appendix C: Terms of Reference
- Utility Plan (Terms of Reference)
- Appendix D: Title Block Template
- Title Block (Template)
- Appendix E: Comment Response Matrix
- Comment Response Matrix (Template)
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
- Publisher
- City of Mississauga Transportation & Works Department
- Category
- Study requirements
- Published under
- Shoring Requirements Checklist — the municipality's own heading
- Agencies
- City of Mississauga Transportation and Works Department · Region of Peel
- Work types
- subdivision · site plan · excavation and shoring
- Signatories
- professional engineer · Ontario Land Surveyor
- Tags
terms-of-referencedevelopment-requirementsutility-plantemplatesengineering-submission