Mississauga · Checklistswritten

Development Requirements Section 8 – Storm Drainage Design Requirements

Published by City of Mississauga — Transportation & Works Department under Apply For A Storm Sewer Connection Approval

Alias
Storm Drainage Design Requirements
Applies to
designer
Document date
January 2020

Section 8 of the City of Mississauga Transportation & Works Department's Development Requirements Manual, linked from the city's storm sewer connection approval page. It carries the city's storm drainage design requirements for all applications: rational method run-off calculations, rainfall intensity curves derived from Pearson International Airport data, runoff coefficients, storm and trunk sewer sizing, manholes, catchbasins, roof leaders and foundation drains, culverts, outfall channels and overland flow routes, then stormwater quality control, runoff volume reduction, and quantity control criteria tabulated subwatershed by subwatershed with the conservation authority named for each.

What it covers

  • 8.0 Introduction
  • 8.1 Storm Sewer Design
  • 8.1.1 Run-off Calculations
  • 8.1.2 Storm Sewer Requirements
  • 8.1.3 Manhole Requirements
  • 8.1.4 Catchbasin Requirements
  • 8.1.5 Roof Leaders, Foundation Drains and Storm Connections
  • 8.2 Channel, Culvert and Overland Flow
  • 8.2.1 Culverts and Bridges
  • 8.2.2 Outfall Channels
  • 8.2.3 Watercourse Erosion and Bank Stability
  • 8.2.4 Overland Flow Routes
  • 8.2.5 Inlet/Outlet Structures
  • 8.3 Stormwater Management Requirements
  • 8.3.1 Stormwater Quality Control
  • 8.3.2 Stormwater Runoff Volume Reduction
  • 8.3.3 Storm Water Quantity Control
  • 8.3.4 Stormwater Management Reports
  • Appendix 1: Watershed Boundaries
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Mississauga — Transportation & Works Department
Category
Checklists · plumbing
Published under
Apply For A Storm Sewer Connection Approval — the municipality's own heading
Agencies
Transportation & Works Department · Credit Valley Conservation · Toronto Region Conservation Authority · Conservation Halton
Work types
new construction · site servicing · subdivision
Tags
design-standardstormwaterstorm-sewerservicingdevelopment-engineering
Development Requirements Section 8 – Storm Drainage Design RequirementsOpen at www7.mississauga.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.