- Alias
- Streetscape Feasibility Studies
- Submit to
- Development and Design Division
- Applies to
- designer
- Work types
- rezoning · site plan · streetscape
The City of Mississauga's terms of reference for a streetscape feasibility study, identified at a pre-application development application review committee meeting for rezoning applications under section 9 of the official plan. The study tests whether a 2 m wide by 2 m deep unencumbered street tree corridor, set at least 0.75 m back from the municipal curb, fits in the public right-of-way along the development's frontages, and what setback or utility relocation follows if it does not. Appendices carry the boulevard treatment areas, the utility plan terms of reference and the streetscape drawing requirements.
What it covers
- Introduction
- Purpose
- Criteria
- Streetscape Feasibility Study Requirements
- Amended Boulevard Treatment Areas
- Appendix B Terms of Reference – Utility Plan
- (i) Plans
- (ii) Cross-sections
- Appendix C Amended Boulevard Streetscape Drawing Requirements
- Figure 1: Street Tree Corridor
- Figure 2: Planting Under or Around Powerlines – Excerpt from Electrical Safety Authority Guidelines
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
- Publisher
- City of Mississauga
- Category
- Study requirements
- Published under
- Urban Design Guidelines And Reference Notes — the municipality's own heading
- Agencies
- City of Mississauga Planning and Building Department · Public Utility Co-ordinating Committee · Electrical Safety Authority
- Signatories
- professional engineer · landscape architect
- Document date
- May 2, 2019
- Tags
terms-of-referencestreetscapestreet-tree-corridorutility-planrezoning