Mississauga · By-lawswritten

Erosion and Sediment Control By-law 512-91

Published by City of Mississauga under Erosion And Sediment Control Permit

Alias
Erosion and Sediment Control By-law
Applies to
any
Work types
site alteration · topsoil removal · grading
Signatories
mayor · city clerk

The City of Mississauga's By-law 512-91, headed Erosion and Sediment Control By-law and subtitled a by-law to protect and conserve top soil, amended by By-law 394-93 and passed under the Topsoil Preservation Act. It defines body of water, erosion, land disturbance, site and topsoil, describes the erosion and sediment control permit issued by the Commissioner and the twenty-item control plan filed with an application, and closes with three schedules: Schedule A on fees and letters of credit, Schedule B site design guidelines, and Schedule C permit conditions.

What it covers

  • Erosion and Sediment Control Permit Fees
  • Letter of Credit for Site Control Measures
  • Site Design Guidelines
  • Site Dewatering
  • Drain Inlet Protection
  • Site Erosion Control
  • Erosion and Sediment Control Permit Conditions
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Mississauga
Category
By-laws · site alteration
Published under
Erosion And Sediment Control Permit — the municipality's own heading
Form ref
Topsoil Preservation Act, R.S.O. 1990, c.T.12
Instruments
Topsoil Preservation Act, R.S.O. 1990, c.T.12 · Provincial Offences Act
Document date
21st day of October, 1991
Building types
any
Document date display
October 21, 1991
Tags
by-lawerosion-and-sediment-controlsite-alterationtopsoilstormwater
Erosion and Sediment Control By-law 512-91Open at mississauga.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.