HamiltonPlanning ApplicationsPlanning guidelines
Published by City of Hamilton
This is the City of Hamilton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
The City of Hamilton's two-page form, version 02, documenting adequate water services for a development application by comparing required fire flow with available fire flow. Introduced after Council adopted the Watermain Fire Flow Requirement Design Guidelines Policy through staff report PW19096 in November 2019, it records required fire flow by the water supply flow rate method of the Ontario Building Code, a target from a land-use table, and available fire flow from a hydrant test or computer modelling, ending in a declaration of adequate services.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.