This is the City of Hamilton’s document, as published on its website on 19 October 2026. The municipality may have changed it since: check the current version at the source. Legal notice
Overview
The City of Hamilton's Construction and Material Specifications, nine numbered forms posted together: Form 200 General Conditions (February 2021), Form 300 General Construction Requirements (November 2018), Form 400 Installation of Watermains (February 2021), Form 500 sewermains with CCTV inspection (January 2025), Form 600 Granular Fill Materials (October 2019), Form 700 Portland Cement Concrete (June 2017), Form 800 Superpave Asphalt Mixtures (November 2025), Form 900 Standard Compaction Requirements (March 2018) and Form 1000 Amendments to Ontario Provincial Standards (June 2017). The Engineering Guidelines' standard notes cite Forms 400 and 500.
What it covers
General Conditions
Definitions
Scope of the Work
Contractor's Responsibilities to Third Parties
Insurance Requirements
General Construction Requirements
Shop Drawings – Submittals and Review
Specification for the Installation of Watermains
Approved Watermain Materials
Ductile Iron Pipe Watermain
Polyvinyl Chloride (PVC) Pipe Watermain
CCTV Sewer Inspections
CCTV Reports and Submittals
Specification for Granular Fill Materials
Granular Pipe Bedding
Specification for Portland Cement Concrete
Compressive Strength Class
Superpave Asphalt Mixtures
Superpave Mixes
Standard Compaction Requirements
Amendments to Ontario Provincial Standards
Check this against the municipality before you rely on it.
DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.