Hamilton · Applicationswritten

Application for Occupancy Permit — Multi-Unit Residential (More Than Two Units), Industrial, Commercial, Institutional

Published by City of Hamilton under Building Permit

Submit to
building@hamilton.ca
Applies to
any
Signatories
owner · authorized agent
Document date
March 5, 2025

The City of Hamilton Building Division's occupancy permit application for buildings of more than two residential units and for industrial, commercial and institutional buildings, the counterpart to the city's single family, semi-detached, townhouse and additional dwelling unit version. It records the address, permit number, floors, units or areas to be occupied, and whether occupancy is full or partial including amenity areas and parking structures. Its checklist runs from water service and building envelope through plumbing, HVAC, fire separations, exits, fire protection systems and fire integrated testing.

What it covers

  • Multi-unit residential
  • Industrial, commercial, institutional
  • All building types
  • OBC requirements – confirm these requirements are completed by checking the box
  • Owner/Authorized Agent (must be completed in full)
Check this against the municipality before you rely on it. DocHub collects what a municipality published; it cannot tell you what is in force today. A newer version may exist, may be titled differently, or may not be posted publicly at all.
Publisher
City of Hamilton
Category
Applications
Published under
Building Permit — the municipality's own heading
Alias
Multi-unit Residential, Industrial (more than 2 units), Commercial, Institutional
Window
A minimum of three (3) business days for confirmation, and a minimum of two (2) business days to process and issue the permit
Form ref
Ontario Building Code – Division C – Subsection 1.3.3
Instruments
Ontario Building Code – Division C – Subsection 1.3.3 · Building By-law 15-058 · Building Code Act, 1992
Required for
An occupancy permit for a multi-unit residential, industrial, commercial or institutional building
Building types
multi-unit residential · industrial · commercial · institutional
Publisher note
Issued by the City of Hamilton's Planning and Economic Development Department, Building Division.
Tags
applicationoccupancypartial-occupancynon-residentialeplan
Application for Occupancy Permit — Multi-Unit Residential (More Than Two Units), Industrial, Commercial, InstitutionalOpen at hamilton.ca

Pick a document. It opens here as the real file — you can select its text, search inside it, follow its own links, and every page is present.